Six electrical disciplines covering the full life cycle - design it, build it,
inspect it, audit it, test it, and train the people who run it. Backed by an in-house
mechanical and plumbing team.
Design and documentation of the complete electrical system, from load estimation to an approvable drawing set.
Design deliverables
Single Line Diagram (SLD)
Electrical Layout Diagram (ELD)
Load calculation & demand assessment
Cable, breaker & protection sizing
Substation, generator & transformer layout
Panel schedules & distribution schemes
Lighting design with simulation (manual & DIALux)
Lightning Protection System (LPS), incl. ESE & conventional
Earthing & equipotential bonding design
Solar PV system design
Energy-efficiency & power-factor review
Low-voltage & ELV systems
Internet & LAN
Telephone
CCTV & surveillance
Public Address (PA)
Building Management System (BMS)
Fire alarm interfacing
Access control & security integration
02 — Electrical
Electrical Installation
Execution and supervision of the installed works, so what is built matches what was designed - and can be signed off.
Scope on site
Complete supervision as per standard code of practice
Substation, transformer & generator installation
LT/HT panel and switchgear installation
Cable laying, containment, tray & trunking works
Earthing grid & LPS installation
Solar PV mounting, string wiring & inverter integration
PA, CCTV, LAN and BMS cabling & termination
Electrical turnkey packages, including ETP and utility plant
Delivered with
Contractor coordination & method-statement review
Material and make approval against specification
Stage inspections and snag closure
Pre-commissioning checks & energisation support
As-built drawings and O&M documentation
03 — Electrical
Electrical Inspection
An independent read on installed electrical work - measured against code, not against opinion.
What is inspected
Compliance against BNBC, NEC and NFPA requirements
Installation quality vs. approved drawings and specification
Protection devices, discrimination and settings
Earthing and lightning protection continuity
Panel and switchgear condition, labelling and access clearances
Cable routing, derating, segregation and terminations
Emergency lighting, exit and life-safety circuits
Documentation, as-builts and test records
You receive
A findings register graded by severity
Photographic evidence against each observation
Code clause references for every non-conformity
A close-out plan with practical remedial actions
Re-inspection and verification on request
04 — Electrical
Electrical Safety Audit
A systematic safety review of a live facility - the audit buyers, insurers and brand compliance teams ask for.
Audit coverage
Single-line verification against the running installation
Protection coordination and fault-level review
Earthing system integrity and measured resistance
Thermographic survey of panels, joints and busbars
Load balance, harmonics and cable loading assessment
Panel room condition, ingress, ventilation and access
Arc-flash and shock hazard exposure review
Emergency power, fire-mode operation and shutdown provisions
Statutory documentation, permits and maintenance records
Reporting
Risk-ranked non-conformity register
Measured test data supporting each finding
Prioritised remediation roadmap with indicative effort
Compliance mapping to BNBC, NFPA, NEC and RSC expectations
Support during buyer, brand or insurer follow-up audits
05 — Electrical
Electrical Tests
Instrumented testing on site, reported as measured values against acceptance limits.
Test services
Thermographic (infrared) scan test
Insulation resistance test
Earth resistance test
LUX (illumination level) test
Transformer oil test
Continuity and polarity verification
Load and power-quality measurement
Protection relay functional checks
How it is delivered
Calibrated instruments and documented procedures
Testing sequenced around production, including shutdown windows
Results tabulated against code and manufacturer limits
Clear pass / attention / fail verdict per circuit or asset
Retest after remediation
06 — Electrical
Electrical Training
Building a skilled electro-mechanical community is part of our stated purpose - we train the people who operate what we design.
Programmes
Electrical safety training for engineers & technicians
Safe isolation, lock-out / tag-out and permit-to-work practice
Panel and switchgear operation & maintenance
Earthing and lightning protection fundamentals
Reading SLD, ELD and protection schemes
Electrical test methods and interpreting results
Fire-mode, emergency power and shutdown drills
Mechanical & fire safety training modules
Formats
In-house sessions at your factory or site
Workshops and technical seminars
Toolbox talks for maintenance crews
Course material and attendance records provided
Mechanical & plumbing
The rest of the MEP scope, in-house
FEMAS Tech has been an electro-mechanical practice since 2014. When a project
needs more than electrical, the fire, plumbing, water-treatment, HVAC and project-management
teams are already in the same office - not subcontracted out.
Fire Safety & Security
Central fire detection & alarm system
Fire protection system (water-based pressurised)
Fire suppression system (foam or inert gas based)
Fire safety & security design
Safety plan approval support
Complete supervision as per standard code of practice
Plumbing & Water Technology
Water supply system
Waste disposal (sanitary) system
Drainage system
Rainwater harvesting & storm water management
ETP (Effluent Treatment Plant)
STP (Sewage Treatment Plant)
WTP (Water Treatment Plant)
WWTP (Waste Water Treatment Plant)
Irrigation system
Deep tube well
HVAC
Heating, ventilating & air-conditioning system design
Load and duct sizing
Equipment selection & plant room layout
Supervision to ASHRAE guidance
Steam & Compressed Air
Steam line design
Compressed air line design
Pipe routing & sizing
Installation supervision
Project Management Consultancy
Design management & coordination
Tender documentation & evaluation support
Construction supervision
Progress monitoring & reporting
Handover and close-out
Standards
Every design is produced to a named code
We design and document to the guidelines of BNBC, NFPA, NEC, RAJUK,
Bangladesh Fire Service & Civil Defense, ASHRAE and the RSC code of practice - and our
senior engineers hold IEB, ECPS, MIET (UK), NFPA, IAPMO (USA) and ASHRAE affiliations.
BNBC
NFPA
NEC
RAJUK
Bangladesh Fire Service & Civil Defense
ASHRAE
RSC code of practice
IAPMO (USA)
LEED
Not sure which of the six you need?
Most enquiries start as one thing and turn out to be another. Describe the building or the
problem and we will scope it honestly - including telling you when you do not need us.